30 December 2013

The Year in Making

I feel like I worked consistently this year on various projects.  So in a way, I feel like I should have more to show for it than I feel like I do.  Here's the tally of what I did this year,
  • 4 pairs of sock for the Boy.  He's outgrown all four pairs now, so they're packed away and he's wearing the 1 new pair I knit for him in December.  I have 1 more pair on the needles for him, but I think I've learned my lesson, I'm not knitting him that many pairs of socks until his feet stop growing.
  • 1 Red Sweater for my Boy.
  • 1 Cream Sweater for my Girl.
  • 2 hats for my Girl (one pink and one white)
  • 1 pair of mittens for myself (I'm working on a hat to match and the hat is about half way done, which is why there is no picture)
  • 1 pair of socks for Chris (also no picture as they haven't been washed yet.  But they were DONE by Christmas!  And that is the material point).
  • 1 Baby Surprise Jacket that I gifted to some friends at church.
  • 2 other baby sweaters for two other friends who both had boys.
  • 1 hat to match one of those sweaters.
  • 1 Bronte-esque shawl for me.  This was a stinging defeat, since I didn't get gauge, I did the math and figured out how many stitches I would need to make the shawl the size I wanted it to be, and when I finally bound off (with 800+ stitches!) the dumb thing was STILL too small!  But it was a good lesson to learn, because in trying it on, I realized, I'm just not a shawl girl.  It seemed like a practical idea at the time (because I could also just wrap the thing around a cold child and presto! warmth), but there was no way that I was going to put it back on the needles and continue to increase it out.  So I ripped the WHOLE thing out, balled up the yarn and set it aside.
  • 1 pair of knee-high socks for me.
  • 1 sweater started for me and about half way done, but then abandoned so that the children could have sweaters for winter.
And that's it.  But the really frustrating thing is that it's winter and I am cold.  Chris has a fleece jacket that he wears all the time.  The kids each have their sweaters.  My sweater that I made last year...well, it's pretty trashed actually.  Partly because I made so many mistakes that annoy me and so I don't treat it as carefully as I would if I hadn't made those mistakes.  And partly because I have small children.  I basically live my life in a washing machine set on AGITATE.

And since I am the cold one this year, I have declared that 2014 is the Year I Knit for Myself.

I have a couple of projects on the needles for other people (fingerless mittens for my sister in law in Savannah, and a pair of socks for the Boy), I'm going to finish those first.  I have one substantial project planned for my Sister Out West (it's going to be a Magnum Opus of a sweater), it's planned, I just need to swatch and then start knitting, but my goal is to get it done and out to her by Next Fall, so I have plenty of time to just sort of meander through it.  I will, of course, be knitting Christmas socks for Chris again.  And if I get a couple of sweaters and a couple of pairs of socks done for me, then I shall be making Chris a sweater too.  I'll have to make at least a simple sweater for my Girl as she's already out-growing her Cream sweater.  But as long as I keep it simple, it should go quickly.  (That's the other lesson I learned this year, for fast growing children, best to keep their sweaters plain and simple.)

The first sweater for me is already started.  It's plain and simple and boring but it will be WARM and that is the important point.  The plan is to break up the plain, simple knitting with more adventurous projects.  An extensively cabled sweater for me (and maybe one for Chris if I get mine done), and perhaps...I haven't quite committed, but perhaps a Fair Isle sweater for myself.

As for the sewing, the only things I finished were the pajama pants for my Boy.  I made 16 pairs in total and he LOVES them.  As in, would never take them off if only I would let him leave the house in his pajamas.  Alas, I do not.   I started a dress for my Girl, but it's not done yet. 

So, I have a pile of sewing projects to work on as well.  I still have my Girl's birthday dress to finish, and then a baby gift for the Boy's Sunday school teachers, and then I have a pile of flannel to turn into cozy nightgowns for my Girl.  Depending on how the dress turns out, I'll post some pictures here.  The bodice is done, I just need to gather the enormous skirt and get that thing attached to the bodice and the zip inserted.  It doesn't sound like that much, but I have gathered and ripped out that skirt FOUR times already.  So, you know, pray for us sinners...

Labels:

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home